Sure is a pretty slab of concrete! ;)
The last steps before framing were completed last week. The lot was cleaned up and graded, the sewer was inspected and covered, the crushed concrete driveway was made and the final pieces of green fencing put up. The dumpster should be delivered this week then we are ready for framing. We don't think that will start until next Monday so it will be a long week of nothing as far as actual changes taking place.